Mining
Project Name: High-Viscosity Tailings Slurry Transfer System
Location: Northern Sweden
Installation Time: May 2021
Products Applied:
■ Servo Progressive Cavity Pumps
Project Background:
The iron ore mine required continuous transport of high-density tailings slurry to a thickener system. Traditional centrifugal pumps suffered from severe wear, frequent blockages, and high maintenance costs due to the abrasive and viscous nature of the slurry.
VOSS Solution:
VOSS provided high-torque servo progressive cavity pumps specifically designed for high-viscosity and high-solids applications. The servo drive allowed automatic speed adjustment based on slurry concentration, ensuring stable flow without pulsation.
Results:
The system has operated continuously for over 12 months with no major failures. Wear on critical components was significantly reduced, energy consumption dropped by 18%, and unplanned downtime was virtually eliminated.